Shift Name
8:00am - 10:00am
Saturday Trailer Setup
(2 desired)

Day 1: 0800 Setup-1000 (2 Required)
Al Kernagis
Joseph B. Bellina
red battreall
 
10:00am - 12:00pm
Saturday Shift 1
(4 needed)

Day 1: 1000-1200 (4 Required)
red battreall
Ed O’Malley
 
12:00pm - 2:00pm
Saturday Shift 2
(4 needed)

Day 1: 1200-1400 (4 Required)
Dan O'Connell
Lisa Post
Lisa Post
 
2:00pm - 4:00pm
Saturday Shift 3
(4 needed)

Day 1: 1400-1600 (4 Required)
Dan O'Connell
Chris Powell
 
4:00pm - Done
Saturday Trailer Breakdown
(2 desired)

Day 1: 1600-Teardown (2 Required)
Chris Powell
 
8:00am - 10:00am
Sunday Trailer Setup
(2 desired)

Day 2: 0800 Setup-1000 (2 Required)
Steven Prokop
red battreall
 
10:00am - 12:00pm
Sunday Shift 1
(4 needed)

Day 2: 1000-1200 (4 Required)
Steven Prokop
red battreall
 
12:00pm - 2:00pm
Sunday Shift 2
(4 needed)

Day 2: 1200-1400 (4 Required)
Pete Green
 
2:00pm - 4:00pm
Sunday Shift 3
(4 needed)

Day 2: 1400-1600 (4 Required)
Pete Green
Chris Powell
 
4:00pm - Done
Sunday Trailer Breakdown
(2 desired)

Day 2: 1600-Teardown (2 Required)
Pete Green
Chris Powell
 

Our coordinator for this part of the program is Mike Polhemus. If you would like additional information about the program, drop us a note at [email protected].